Optimum Techniques for Contracting · Dammam

Experts in HDPE Geomembrane Installation

MWAN-licensed landfill lining contractor working to Saudi Aramco, SABIC and Royal Commission HSE standards, serving industrial and environmental clients across Saudi Arabia.

Waste Management Licence

National Center for Waste Management (MWAN)

Licence No.

005701

Issued by
National Center for Waste Management (MWAN)
Sub-activity
Landfill Lining
Approved capacity
7,000 m² per day
Valid until
03-08-2027
  • MWAN 005701

    Waste Management Licence

  • 7,000 m²/day

    Approved capacity

  • GRI-GM13 & ASTM D4437

    Material and testing standards

  • Aramco · SABIC · RC

    HSE standards we work to

  • CR 2050187266

    Commercial Registration

  • Dammam

    Eastern Province

MWAN-licensed landfill lining

Landfill lining to MWAN requirements

MWAN's landfill guidelines set a minimum geomembrane for each landfill category and require every liner to be installed, tested and documented under an approved CQA plan.

Reference: MWAN TG-WM-05 (2), Standards & Technical Guidelines for the Design, Construction and Operation of Landfills, 01 November 2024.

Minimum geomembrane by landfill category
CategoryLandfill typeGeomembrane layer
1Hazardous wasteمردم النفايات الخطرةMinimum 2.5 mm HDPE, OR double liner with leak detection: 2.0 mm HDPE + geocomposite drainage layer + 2.0 mm HDPE
2Non-hazardous wasteمردم النفايات غير الخطرةMinimum 1.5 mm HDPE
3Inert wasteمردم النفايات الخاملةGeomembrane not required (depends on the liner system used)

Final thickness follows the approved design and may be increased based on the project's risk assessment.

QA/QC, testing and equipment

Testing & QA/QC

  • Non-destructive testing: vacuum box, spark testing
  • Destructive testing: peel and shear tests
  • Trial welds before production welding
  • Third-party validation upon request
  • Compliance with ASTM D4437 and GRI-GM13
  • Detailed daily reporting and handover documentation

Our own equipment

  • Automatic wedge welders (fusion welding)
  • Extrusion welders (detail work, corners, penetrations)
  • Hot air guns
  • Spark testers and vacuum box leak detectors
  • Tensiometer for peel and shear testing
  • Sheet rollers, cutters and ancillary tools
  • Calibration certificates for testing equipment available on request

Safety

Lining work combines heavy rolls, hot welding tools and slippery slopes. We plan and control it to the HSE standards of Saudi Aramco, SABIC and the Royal Commission.

  • Job Safety Analysis (JSA) for all tasks
  • PPE enforcement and daily safety briefings
  • Emergency response protocols
  • Compliance with Saudi Aramco, SABIC and Royal Commission standards
  • Manufacturer-trained welding technicians
  • Regular safety and skill evaluations
  • ISO-compliant documentation

Some of our clients & partners

  • King Fahd University of Petroleum & Minerals (KFUPM)
    King Fahd University of Petroleum & Minerals (KFUPM)
  • Riadat Almamoura International Company (RAIC)
    Riadat Almamoura International Company (RAIC)
  • Rowad
    Rowad
  • Al-Khaldi Real Estate
    Al-Khaldi Real Estate

We guarantee our workmanship and support our clients after handover.

Contact us

Call or WhatsApp us, email, or send your project details through the quotation form.

Email

General enquiries
info@optechsco.com
Sales & quotations
Use the quotation form on this page, or email info@optechsco.com
Careers / HR
hr@optechsco.com

National address

Optimum Techniques for ContractingEastern Chamber Investment TowerBuilding No. 3030, Unit 3Additional No. 6512Al Hussam District, Dammam 34223Eastern Province, Kingdom of Saudi Arabia

The map loads from Google Maps when you choose to show it.